A 25 tonne capacity crane
lifted the Douglas Fir timber beams from the lorry onto the site.
All
the joints and details were designed and cut by “The Timber Frame
Company” who are based in somerset. The individual panels and joints
were assembled in their workshop, tested and then taken apart to make
sure that everything fitted perfectly. More information is available at:
http://www.thetimberframe.co.uk/
Once the individual beams had been delivered, panels and frames where
assembled on the ground and then lifted with the crane onto the site.
The joints are traditional with mortice and tenon joints and pegged
together with oak pegs.
First Frame in place on day one of the timber frame build
The timber frame build has taken place at an impressive pace, while
people seem very laid back. Very experienced TFC carpenters have
smoothed the way without any onsite alterations needed, whilst achieving
a high accuracy to the original plans.
Last Sunday was the first open day with guided tours given to the
neighbors and local people. There is much anticipation and excitement as
to how this building is going to develop. Keep watching this space to
see what happens next.